 |
Project |
CLONDALKIN GRASSROOT PHARMACEUTICALS PLANT |
 |
| Industry Code |
07 Chemical Processing (CPI) |
Project ID |
80300055 |
| TIV |
$70,000,000 |
Verification ID |
EU020417-01 |
| Project SIC Prod |
2834 Pharmaceutical Preparations |
| Plant SIC |
2834 Pharmaceutical Preparations |
| Environmental |
Air (A)
Land (L)
Water (W)
|
Research Date |
03/Apr/2002 |
| OWNER |
Takeda Chemical Industries Limited |
Plant |
Clondalkin Pharmaceuticals |
| Address |
1-1 Doshomachi 4-Chome Chuo-Ku |
Plant ID |
1058254 |
Activity |
01 Reports |
| City/State |
Osaka, 541 |
Unit Name |
|
| Phone |
011 81 (6) 6204-2111 |
Zone |
IE*01 |
County |
Dublin |
| Contact |
Shozo Nakamura |
Location |
Clondalkin Industrial Zone |
| Title |
Pharmaceutical Division Director |
City/State |
Clondalkin, Ireland |
| E-Mail |
N/A |
Phone |
011 81 (6) 6204-2111 |
| DEVELOPER |
|
SITE.REP |
|
| Address |
|
Address |
|
| City/State |
|
City/State |
|
| Phone |
|
Phone |
|
| Contact |
|
Contact |
|
| Title |
|
Title |
|
| E-Mail |
|
E-Mail |
|
| PEC® Timing |
E2 |
PEC® Activity |
Preliminary Engineering (22) |
| Scope |
OWNER performs Preliminary Engineering for a G-R Pharmaceuticals Plant. DETAILS: Construct Plant and install Process plus supporting Equipment to produce and package Bulk Pharmaceuticals, including Actos which is used in treating Diabetes. REQUIRES: Reactor Vessels, Heat Exchangers, Mixing and Blending Equipment, Controls (PLC), Temperature and Humidity Controls, Flowmeters, Piping (SS and Carbon), Pumps and Motors, Tanks (AST). ENVIRONMENTAL: (A) HEPA Filtration; (L) Liners; (W) Water Purification Sys. |
| Schedule |
OWNER continues with Preliminary Engineering and will select E+P+C/M 2Q02 (Apr). Upon completion of Detailed Engineering, E+P+C/M will release remaining Equipment RFQ's plus Subcontractor Bid Documents 3Q02 (Sep)-4Q02. Construction Kick-Off 4Q02 (Oct). Project Completion 1Q04 (Mar). |
| Engineering |
|
Civil
|
Electrical
|
Environmental
|
HVAC
|
Instrumentation
|
Mechanical
|
Structural
|
Process
|
|
| Contracting |
|
Civil
|
Electrical
|
Environmental
|
HVAC
|
Instrumentation
|
Mechanical
|
Structural
|
|
|
Project Key Needs |
|
Civil/Site
|
Structural
|
Architectural
|
Control Room
|
Process Equip
|
Heat Transfer
|
|
Instrumentation
|
Electrical
|
Mechanical
|
HVAC
|
Storage Equip
|
NDE
|
|
Piping/Fittings
|
Insulation/Coatings
|
Environmental
|
Utilities
|
Valves
|
Pumps
|
|
Communications
|
|
Batch Process
|
|
Packaging
|
|
|
| Energy |
|