PROJECT REPORT
Project CLONDALKIN GRASSROOT PHARMACEUTICALS PLANT
Industry Code 07 Chemical Processing (CPI) Project ID 80300055
TIV $70,000,000 Verification ID EU020417-01
Project SIC Prod 2834 Pharmaceutical Preparations
Plant SIC 2834 Pharmaceutical Preparations
Environmental Air (A) Land (L) Water (W) Research Date 03/Apr/2002
OWNER Takeda Chemical Industries Limited Plant Clondalkin Pharmaceuticals
Address 1-1 Doshomachi 4-Chome Chuo-Ku Plant ID 1058254 Activity 01 Reports
City/State Osaka, 541 Unit Name  
Phone 011 81 (6) 6204-2111 Zone IE*01 County Dublin
Contact Shozo Nakamura Location Clondalkin Industrial Zone
Title Pharmaceutical Division Director City/State Clondalkin, Ireland
E-Mail N/A Phone 011 81 (6) 6204-2111
DEVELOPER SITE.REP
Address Address
City/State City/State
Phone Phone
Contact Contact
Title Title
E-Mail E-Mail
PEC® Timing E2 PEC® Activity Preliminary Engineering (22)
Scope OWNER performs Preliminary Engineering for a G-R Pharmaceuticals Plant. DETAILS: Construct Plant and install Process plus supporting Equipment to produce and package Bulk Pharmaceuticals, including Actos which is used in treating Diabetes. REQUIRES: Reactor Vessels, Heat Exchangers, Mixing and Blending Equipment, Controls (PLC), Temperature and Humidity Controls, Flowmeters, Piping (SS and Carbon), Pumps and Motors, Tanks (AST). ENVIRONMENTAL: (A) HEPA Filtration; (L) Liners; (W) Water Purification Sys.
Schedule OWNER continues with Preliminary Engineering and will select E+P+C/M 2Q02 (Apr). Upon completion of Detailed Engineering, E+P+C/M will release remaining Equipment RFQ's plus Subcontractor Bid Documents 3Q02 (Sep)-4Q02. Construction Kick-Off 4Q02 (Oct). Project Completion 1Q04 (Mar).
Engineering
Civil Electrical Environmental HVAC Instrumentation Mechanical Structural Process
Contracting
Civil Electrical Environmental HVAC Instrumentation Mechanical Structural  
Project
Key Needs
Civil/Site Structural Architectural Control Room Process Equip Heat Transfer
Instrumentation Electrical Mechanical HVAC Storage Equip NDE
Piping/Fittings Insulation/Coatings Environmental Utilities Valves Pumps
Communications   Batch Process   Packaging  
Energy
  Boiler        
Buy Electricity Fuel  