The Project Scope defines the Owner's relationship with selected Contractors, along with a condensed narrative defining the project scope, technology, product capacity when available, and a list of major process equipment/product requirements identified for purchase or installation. Also, major environmental equipment, services and related technologies are defined for Air, Land and Water that require installation and/or procurement.
Project Scope Acronyms & Abbreviations
Contract Terms:
A&E - Architectural and Engineering
D+E - Design and Engineering
E+P - Engineering and Procurement
E+C - Engineering and Construction
E+P+C - Engineering, Procurement and Construction
D+E+P+C/M - Design, Eng, Procurement & Construction
Turn-Key - Complete Project Responsibilities
Lump-Sum - Hard Money Contract
Cost Plus - Project Cost with Fixed Fee
P/M - Procurement Manager
C/M - Construction Manager
G/C - General Contractor
E&I - Electrical and Instrumentation
I&C - Instrumentation and Control
Mech - Mechanical
Sub - Subcontractor
Equipment:
HRSG - Heat Recovery Steam Generator
WHRG - Waste Heat Recovery Generator
CFB - Circulating Fluidized Bed Boiler
Cogen - Cogeneration
C+C - Combined-Cycle
BFW - Boiler Feedwater
CT - Combustion Turbine
Turb/Gen - Turbine Generator Set
ESP - Electrostatic Precipdator
FGD - Flue Gas Desulfurizer
CEMS - Continuous Emissions Monitoring System
FCCU - Fluid Catalytic Cracking Unit
RCCU- Residual Catalytic Cracking Unit
SRU - Sulfur Recovery Unit
HDS - Hydrogen Desulfurizer
AST - Above Ground Storage Tank
UST - Underground Storage Tank
SS - Stainless Steel
CS - Carbon Steel
PLC - Programmable Logic Controller
DCS - Distributive Control System
MCC - Motor Control Center
VS - Variable Speed
CSM - Constant Speed Motor
Activity:
BOP - Balance-of-Plant
EXP - Expansion
G-R - Grassroot
Add - Addition
Mod - Modernization
Mod's - Modifications
Upg - Upgrade
Maint - Maintenance
S/D - Shutdown
T/A - Turnaround
MRO - Maintenance, Repair and Overhaul
Inspect - Inspection
Capacity:
CUYDS - Cubic Yards
BBPD - Barrels per Day
GPD - Gallons per Day
GPM - Gallons per Minute
LBS/HR - Pounds per Hour
MM - Millions
MW - Megawatts
PSI - Pounds per Square Inch
SCFD - Standard Cubic Feet per Day
SQFT - Square Foot
T/D - Tons per Day
T/Yr - Tons per Year
T/Mo - Tons per Month
|
|
 |
 |
 |


|