Argentina's Refinor SA Restarts Campo Duran Refinery After COVID-19 Shutdown, an Industrial Info Market Brief
Attachment: A
The 25,000-barrel-per-day Campo Duran Refinery in Argentina has resumed operations after being taken offline due to pandemic risks. The facility is running at 50% capacity, not only in response to low fuel demand, but also because of a lack of feedstock. The facility has two Turbex units with a combined capacity of 21 million standard cubic meters per day; however, only one of them is operating, while the lone Topping unit also is running at 50% capacity due to limited feedstock.