IIR Top Power News Today: September 22nd 2020
Basin Electric Power Cooperative has rescheduled major boiler and turbine generator inspection and repairs on the 216-megawatt (MW) Leland Olds 01 unit at its Leland Olds Power Station in North Dakota, due to COVID-19. This event, which was originally scheduled to begin September 20, is now scheduled for September 17, 2021 and will be completed October 16, 2021.