Check out our latest podcast episode on the 2026/27 business ecosystem across Mexico, Central America, and the Caribbean. Watch now!
Sales & Support: +1 (800) 762-3361
Member Resources

Power

License Granted for Russia's First Civil Nuclear Power Plant

Licenses for Russia's first civil nuclear power and heating plant have finally been granted.

Released Monday, November 23, 2009

License Granted for Russia's First Civil Nuclear Power Plant

Researched by Industrial Info Resources (Sugar Land, Texas)--Licenses for Russia's first civil nuclear power and heating plant have finally been granted. The plant will be constructed in Seversk, in the Tomsk Oblast region of southwestern Siberia. Seversk, with about 100,000 inhabitants, was known as Tomsk-7 in the Soviet era.

Seversk is the location of the Siberian Group of Chemical Enterprises and contains older nuclear reactors and chemical plants for the separation, enrichment and processing of uranium and plutonium. The two remaining operational plutonium-production reactors, used by the military but also supplying heat and power to the city, were shut down in April and June this year under a nonproliferation treaty signed between Russia and the United States in 2003.

The new plant will consist of two 1,200-megawatt (MW) VVER pressurized water reactors and is reported to cost $4.6 billion (3.1 billion euros). Originally scheduled to be completed in 2015 and 2017, the reactors were put on hold for two years as a result of reduced demand following the global recession. The granting of the licenses is a significant step in the resumption of the project.

The steam turbines for the power plant will be supplied by Alstom Atomenergomash LLC, a joint venture established in 2007 between Alstom SA (EPA:ALO) (Levallois-Perret, France) and OAO Atomenergomash, a subsidiary of the Russian state-owned company Atomenergoprom (Moscow).

The turbines will be based on Alstom's Arabelle half-speed turbine technology, a central part of Alstom's nuclear technology. The turbine is widely recognized as one of the most efficient in the industry and can produce power between 1,000 MW and 1,800 MW with high reliability. The turbines achieve this outstanding performance through an exclusive welded rotor technology developed by Alstom and used in all of the company's gas and steam turbines. Alstom claims the technology has exceptional resistance to corrosion with a life of up to 60 years.

In September 2008 the contract for pre-engineering works was signed. ALSTOM Atomenergomash LLC contracted with Atomenergoproekt OJSC the development of design and pre-design documentation in the scope of a steam turbine, turbogenerator and turbine hall equipment, based on ALSTOM ARABELLE™ technology. Under the terms of this Contract, ALSTOM Atomenergomash LLC, given the strong support by ALSTOM, will develop and submit to Atomenergoproekt OJSC the documentation in the scope necessary and sufficient for the development of Justification of Investments and Construction Project for the Seversk NPP in Tomsk Region.

Construction of the plant is scheduled to begin in 2010. Russia had plans to double its nuclear power generating capacity by 2020, with a build schedule of up to three new reactors per year.

View Project File - 81000305

Industrial Info Resources (IIR) is the leading provider of global market intelligence specializing in the industrial process, heavy manufacturing and energy related markets. For more than 26 years, Industrial Info has provided plant and project opportunity databases, market forecasts, high resolution maps, and daily industry news.
/news/article.jsp false

Share This Article

Want More IIR News Intelligence?


Make us a Preferred Source on Google to see more of us when you search.

Add Us On Google

Please verify you are not a bot to enable forms.

What is 5 + 2?

Ask Us

Have a question for our staff?

Submit a question and one of our experts will be happy to assist you.

By submitting this form, you give Industrial Info permission to contact you by email in response to your inquiry.

A glowing computer chip is placed on a dark blue circuit board. Bright blue lines and nodes create a futuristic, technological ambiance.

Forecasts & Analytical Solutions

Where global project and asset data meets advanced analytics for smarter market sizing and forecasting.

Explore Our Solutions
Dimly lit data center with rows of towering black server racks, glowing blue lights, and a sleek, futuristic ambiance.

Industrial Project Opportunity Database and Project Leads

Get access to verified capital and maintenance project leads to power your growth.

Discover Our Database