Industrial Info is tracking more than $395 million worth of capital Oil & Gas Production drilling projects that are planned to kick off in 2020. Most of the projects will be performed in Tabasco State, followed by Veracruz and Tamaulipas. The production drilling projects include both onshore and offshore locations.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×