Duke Energy Progress LLC took 750.4 megawatts (MW) offline from the Brunswick 01 unit, today, March 24, at its Brunswick Nuclear Power Station in Tennessee. The unit is operating at 80% and ramping up from a refueling outage, but this event is scheduled to end today.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×