
Brazil's Usiminas has shuttered three blast furnaces at their Ipatinga Intendente Camara and Jose Bonifacio de Andrada e Silva steel mills due to the COVID-19 crisis.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×