JFE Steel Corporation will shut down the second blast furnace and related equipment in the Keihin area of Japan by fiscal 2023 (ending March 2024) to reduce domestic crude steel production capacity by around 4 million tons, or about 13%.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×