Indian refiners will increase sour water stripper capacity by about 3,000 cubic meters per hour (M3/hr) through the end of 2025.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×