Savannah Petroleum and China National Petroleum Corporation (CNPC) are moving ahead with the route mapping for the 1,900-kilometer Niger-Benin Pipeline.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×