Forgot your login?

Enter the e-mail address you used when you registered an account with IIR Energy.

A message will be sent to the E-Mail Address found in our records containing the associated username(s) as well as instructions for a password reset.

E-Mail:
Also, what is 79 + 6?

Petrobras Releases Full Buzios Field Development Plan, an Industrial Info Market Brief

Petroleos Brasileiros SA (Petrobras), along with Doris Engenharia LTDA, is performing basic engineering for a generic floating production, storage and offloading (FPSO) prototype to be used for the installation of four new production units in the Santos Basin Pre-salt area, Buzios 9, Buzios 10, Buzios 11 and Buzios 12.

Login or Register for Instant Access

Subscribe Now!

(All Fields Required)

IIR Logo Globe

Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.

×