Marathon, on October 31, was forced to shut down the 56,000-barrel-per-day (BBL/d) Crude 6 and 40,000-BBL/d Vacuum Distillation Unit (VDU) on the north side of its 120,000-BBL/d refinery in El Paso, Texas. At this time, plant personnel have not indicated a restart timeline.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×