Forgot your login?

Enter the e-mail address you used when you registered an account with IIR Energy.

A message will be sent to the E-Mail Address found in our records containing the associated username(s) as well as instructions for a password reset.

E-Mail:
Also, what is 83 + 7?

Verve Energy's Warradarge Windfarm Undergoes Feasibility Studies

PERTH, AUSTRALIA--June 27, 2013--Researched by Industrial Info Resources (Perth, Australia)--Verve Energy (Perth, Australia), a state-owned power generator, is currently developing the two-stage Warradarge Windfarm in the Midwest region, 270 kilometres (km) north of Perth. The company proposed building the massive, $600 million windfarm in 2012. When completed, it will generate up to 100 MW of electricity from Stage 1 alone. The windfarm will use 2.5-MW turbines and will have up to 40 turbines as part of Stage 1 construction.

Login or Register for Instant Access

Subscribe Now!

(All Fields Required)

IIR Logo Globe

Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.

×