Forgot your login?

Enter the e-mail address you used when you registered an account with IIR Energy.

A message will be sent to the E-Mail Address found in our records containing the associated username(s) as well as instructions for a password reset.

E-Mail:
Also, what is 2 + 5?

Iberdrola do Brasil Awaits Transmission Line Completion to Begin Operations at Caetité Windfarm at Bahia

Iberdrola do Brasil Awaits Transmission Line Completion to Begin Operations at Caetité Windfarm at Bahia

CORDOBA, ARGENTINA--November 14, 2013--Researched by Industrial Info Resources Latin America (Cordoba, Argentina)--Iberdrola S.A. (Madrid, Spain), through its joint venture Força Eolica do Brasil, completed the construction of its Caetité wind complex in the city of Caetité, in the state of Bahia, Brazil, last September. Força Eolica do Brasil was formed by the subsidiaries Iberdrola do Brasil (Rio de Janeiro, Brazil) and Neoenergia (Rio de Janeiro).

Login or Register for Instant Access

Subscribe Now!

(All Fields Required)

IIR Logo Globe

Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.

×