Forgot your login?

Enter the e-mail address you used when you registered an account with IIR Energy.

A message will be sent to the E-Mail Address found in our records containing the associated username(s) as well as instructions for a password reset.

E-Mail:
Also, what is 86 + 0?

IIR Top Refining News Today

Total has shut down the 40,000-barrel-per-day (BBL/d) Atmospheric Crude Oil Unit (ACU) (Unit 812) at its 190,000-BBL/d refinery in Port Arthur, Texas, due to an extended outage on the 76,000-BBL/d Fluid Catalytic Cracking Unit (FCCU) 2 as a result of a small fire on August 17. The 24,000-BBL/d Diesel Hydrotreater (HT) 2 and 50,000-BBL/d Gasoline HT also were shut down. This event is expected to last until at least August 25.

Login or Register for Instant Access

Subscribe Now!

(All Fields Required)

IIR Logo Globe

Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.

×