
Shell has begun to receive a limited daily power allocation from Entergy at its 240,000-barrel-per-day (BBL/d) Norco Refinery in Louisiana, in the wake of Hurricane Ida. At this time, there is no set timeline for the restart, as Shell continues to assess the site and awaits full restoration of power.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×