Forgot your login?

Enter the e-mail address you used when you registered an account with IIR Energy.

A message will be sent to the E-Mail Address found in our records containing the associated username(s) as well as instructions for a password reset.

E-Mail:
Also, what is 24 + 4?

Design-Build Team Picked for On-Again, Off-Again Boston Green Line Extension

SUGAR LAND--November 28 2017--Researched by Industrial Info Resources (Sugar Land, Texas)--The long-awaited Green Line light rail extension in Boston, Massachusetts, received a boost recently when a joint venture led by Fluor Corporation (NYSE:FLR) (Irving, Texas) was picked to design and oversee the project. The roots of the extension go back to 1990, when state officials announced a long-term mass-transit plan for Boston that included extending the Green Line from Lechmere, in Cambridge, to West Medford, according to the Boston Globe. Since that time, however, the project has seen a number of setbacks and delays.

Login or Register for Instant Access

Subscribe Now!

(All Fields Required)

IIR Logo Globe

Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.

×