Forgot your login?

Enter the e-mail address you used when you registered an account with IIR Energy.

A message will be sent to the E-Mail Address found in our records containing the associated username(s) as well as instructions for a password reset.

E-Mail:
Also, what is 89 + 6?

Today's Refining Hotline Headlines

Today

Marathon, on October 3, began to shut down the 145,000-barrel-per-day (BBL/d) Crude 10 A Unit at its 530,000-BBL/d refinery in Garyville, Louisiana, for a 21-day maintenance turnaround. After the event is completed, the 145,000-BBL/d Crude 10 B will shut down for 21 days. The 134,000-BBL/d b/d Fluid Catalytic Cracker Unit (FCCU) 25, 39,600-BBL/d Hydrofluoric Alkylation (HF Alky) 27 and 87,000-BBL/d Gasoline Desulfurizer 55 also were shut down on October 3, for eight weeks of planned maintenance.

Login or Register for Instant Access

Subscribe Now!

(All Fields Required)

IIR Logo Globe

Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.

×