Forgot your login?

Enter the e-mail address you used when you registered an account with IIR Energy.

A message will be sent to the E-Mail Address found in our records containing the associated username(s) as well as instructions for a password reset.

E-Mail:
Also, what is 37 + 4?

Indonesia's Kerinci Hydropower Plant Set to Begin Operations

Indonesia

MANILA, PHILIPPINES--May 19, 2025--Researched by Industrial Info Resources (Sugar Land, Texas)--Construction recently wrapped on the Kerinci Hydroelectric Power Plant (PLTA Kerinci) in Jambi, Indonesia, which is ready for operations. The PLTA Kerinci project, which was developed by PT Kerinci Merangin Hydro, is part of a strategic initiative to bolster Indonesia's renewable energy infrastructure and regional energy stability.

Login or Register for Instant Access

Subscribe Now!

(All Fields Required)

IIR Logo Globe

Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.

×