Reports related to this article:
Plant(s): View 3 related plants in PECWeb
Released March 29, 2023 | SUGAR LAND
en
North America
Valero, on March 28, reportedly shut down the 75,000-barrel-per-day (BBL/d) Fluid Catalytic Cracking Unit (FCCU) 1241 at its 325,000-BBL/d refinery Port Arthur, Texas due to a loss of steam. Meanwhile, the 115,000-BBL/d AVU 147 (Crude) and the HCU 942 (Hydrocracker) were shut February 13 and February 14, respectively, for planned maintenance and continue to remain offline even though both were expected to be online in mid-March. Separately, the new 55,000-BBL/d Delayed Coker Unit 844 is reported to be mechanically complete, with expectations for it to be online in late April or early May.
Suncor Energy, on March 27, began planned repairs at its 130,000-BBL/d Montreal, Canada, refinery, which includes a 42-day turnaround of four units.
International
Petroineos France SAS's 218,000-BBL/d Lavera Refinery in France, remains offline. The entire refinery was fully shut down on March 20 as a result of the ongoing strike action.
Industrial Info Resources (IIR) is the leading provider of industrial market intelligence. Since 1983, IIR has provided comprehensive research, news and analysis on the industrial process, manufacturing and energy related industries. IIR's Global Market Intelligence (GMI) helps companies identify and pursue trends across multiple markets with access to real, qualified and validated plant and project opportunities. Across the world, IIR is tracking over 200,000 current and future projects worth $17.8 Trillion (USD).
Valero, on March 28, reportedly shut down the 75,000-barrel-per-day (BBL/d) Fluid Catalytic Cracking Unit (FCCU) 1241 at its 325,000-BBL/d refinery Port Arthur, Texas due to a loss of steam. Meanwhile, the 115,000-BBL/d AVU 147 (Crude) and the HCU 942 (Hydrocracker) were shut February 13 and February 14, respectively, for planned maintenance and continue to remain offline even though both were expected to be online in mid-March. Separately, the new 55,000-BBL/d Delayed Coker Unit 844 is reported to be mechanically complete, with expectations for it to be online in late April or early May.
Suncor Energy, on March 27, began planned repairs at its 130,000-BBL/d Montreal, Canada, refinery, which includes a 42-day turnaround of four units.
International
Petroineos France SAS's 218,000-BBL/d Lavera Refinery in France, remains offline. The entire refinery was fully shut down on March 20 as a result of the ongoing strike action.
Industrial Info Resources (IIR) is the leading provider of industrial market intelligence. Since 1983, IIR has provided comprehensive research, news and analysis on the industrial process, manufacturing and energy related industries. IIR's Global Market Intelligence (GMI) helps companies identify and pursue trends across multiple markets with access to real, qualified and validated plant and project opportunities. Across the world, IIR is tracking over 200,000 current and future projects worth $17.8 Trillion (USD).