Join us on January 28th for our 2026 North American Industrial Market Outlook. Register Now!
Sales & Support: +1 800 762 3361
Member Resources
Industrial Info Resources Logo
Global Market Intelligence Constantly Updated Your Trusted Data Source for Industrial & Energy Market Intelligence
Home Page
Released on Wednesday, January 29, 2014

Power

Panel Approves Preliminary Study for Huaneng Yangqu Coal-Fired Cogeneration Project

An expert panel has approved the preliminary feasibility study for the 700-megawatt (MW) Huaneng Yangqu coal-fired cogeneration power project in China, according to a key engineering firm.

Reports related to this article:


Researched by Industrial Info Resources China (Beijing, China)--An expert panel has approved the preliminary feasibility study for the 700-megawatt (MW) Huaneng Yangqu coal-fired cogeneration power project in China, according to a key engineering firm.

The expert panel, under the Development and Reform Commission of Shanxi Province, approved the report by Shanxi Electric Power Exploration & Design Institute (SEPDI) (Taiyuan, Shanxi), a subsidiary of China Energy Engineering Corporation (CEEC) (Beijing), the engineering firm announced on January 22.

The expert panel unanimously approved the report, which contained information on market analysis, the plant site, water source, coal source, ash disposal, the general layout and the installed capacity.

The Huaneng Yangqu coal-fired cogeneration project, located in Quyang County of Taiyuan City, ultimately would have four 350-MW, coal-fired units. The initial stage of the project would include two supercritical, coal-fired cogeneration units, together with a high-efficiency electrostatic dust-removal device, a flue-gas desulfurization device, and selective catalyst reduction (SCR) and low-NOx burners for NOx control. As one of the heat supply sources in the Total Clean Heat Supply Action Plan by the government of Taiyuan City in 2013, the project will improve environmental quality and promote the regional economy, as well as upstream and downstream industrial development in Taiyuan.

As reported, Huaneng Shanxi Branch Company (Taiyuan, Shanxi) will invest in the project. As a regional subsidiary of China Huaneng Group (Beijing) in Shanxi, Huaneng Shanxi Branch is also working on the pre-stage preparation of a 2,000-MW, coal-fired power project in Shanying County.

View Project Report - 300139732

Industrial Info Resources (IIR), with global headquarters in Sugar Land, Texas, three offices in North America and nine international offices, is the leading provider of global market intelligence specializing in the industrial process, heavy manufacturing and energy markets. Industrial Info's quality-assurance philosophy, the Living Forward Reporting Principle™, provides up-to-the-minute intelligence on what's happening now, while constantly keeping track of future opportunities.
/news/article.jspfalse
Share This Article
Want More IIR News?

Make us a Preferred Source on Google to see more of us when you search.

Add Us On Google

Please verify you are not a bot to enable forms.

What is 53 + 8?
Ask Us

Have a question for our staff?

Submit a question and one of our experts will be happy to assist you.

By submitting this form, you give Industrial Info permission to contact you by email in response to your inquiry.

Forecasts & Analytical Solutions

Where global project and asset data meets advanced analytics for smarter market sizing and forecasting.

Learn More
Industrial Project Opportunity Database and Project Leads

Get access to verified capital and maintenance project leads to power your growth.

Learn More
Industry Intel


Explore Our Coverage

Industries


  • Electric Power
  • Terminals
  • Pipelines
  • Production
  • Alternative Fuels
  • Petroleum Refining
  • Chemical Processing
  • Metals & Minerals
  • Pulp, Paper & Wood
  • Food & Beverage
  • Industrial Manufacturing
  • Pharmaceutical & Biotech

Trending Sectors


  • Data Centers
  • Semiconductors
  • Battery Supply Chain
  • Packaging
  • Nuclear Power
  • LNG
IIR Logo Globe

Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.

×