Check out our latest podcast episode on the 2026/27 business ecosystem across Mexico, Central America, and the Caribbean. Watch now!
Sales & Support: +1 (800) 762-3361
Member Resources

Power

NDRC Approves Baishi Hydropower Station on Yuanshui River

The National Development and Reform Commission has approved plans for the Tuokou hydropower station on the Yuanshui River.

Released Wednesday, May 14, 2008

NDRC Approves Baishi Hydropower Station on Yuanshui River

Researched by Industrial Info Resources (Sugar Land, Texas)--The National Development and Reform Commission has approved plans for the Tuokou hydropower station on the Yuanshui River. The station will be the fifth project in the cascade development scheme mainstream of the river. The plant's main function will be power generation with other benefits, such as improved river navigation, tourism and the creation of a fishery.

The station will have four 200-megawatt (MW) Francis turbine-generating unitS. The power station is also planned with two small 15 MW units designed to maintain a minimum ecological flow on the river. The plant's total installed capacity will be 830 MW, and the annual average power output will be 2.131 billion kilowatt-hours.

The station comprises a main dam at Dongyousi (including spillway), two auxiliary dams at Baituchong and Wangmaxi, a river-bed type powerhouse, a navigation facility, as well as the river bend seepage control project with a total investment of $686 million. The project will be built and operated by Huaihua Yuanshui River Power Development Company, a company jointly invested by Wuling Power Company Limited (Changsha, China), a subsidiary of China Power Investment Corporation (Beijing), and the Mid-south Design & Research Institute (Changsha, China), a subsidiary of China Hydropower Engineering Consultancy Corporation (CHECC) (Beijing). The Mid-South Design & Research Institute of CHECC is responsible for the project's design and survey.

In February 2007, the station's feasibility study was approved. Pre-stage preparations have been completed, and construction is expected to start later this year. The total construction period will be about 48 months.

Industrial Info Resources (IIR) is a marketing information service specializing in industrial process, energy and financial related markets with products and services ranging from industry news, analytics, forecasting, plant and project databases, as well as multimedia services.
/news/article.jsp false

Share This Article

Want More IIR News Intelligence?


Make us a Preferred Source on Google to see more of us when you search.

Add Us On Google

Please verify you are not a bot to enable forms.

What is 91 + 6?

Ask Us

Have a question for our staff?

Submit a question and one of our experts will be happy to assist you.

By submitting this form, you give Industrial Info permission to contact you by email in response to your inquiry.

A glowing computer chip is placed on a dark blue circuit board. Bright blue lines and nodes create a futuristic, technological ambiance.

Forecasts & Analytical Solutions

Where global project and asset data meets advanced analytics for smarter market sizing and forecasting.

Explore Our Solutions
Dimly lit data center with rows of towering black server racks, glowing blue lights, and a sleek, futuristic ambiance.

Industrial Project Opportunity Database and Project Leads

Get access to verified capital and maintenance project leads to power your growth.

Discover Our Database