Check out our latest podcast episode on the 2026/27 business ecosystem across Mexico, Central America, and the Caribbean. Watch now!
Sales & Support: +1 (800) 762-3361
Member Resources

Power

Design Has Begun for Largest Thermal Power Project in Yunnan

The Zhenxiong Power Plant is located at Tangfang Town, Zhenxiong County, Yunnan Province. The plans are to build four 600-megawatt (MW) units in two phases.

Released Friday, August 24, 2007

Design Has Begun for Largest Thermal Power Project in Yunnan

Researched by Industrial Info Resources (Sugar Land, Texas) -- Preliminary design for the first phase of the Zhenxiong Power Plant passed the pre-examination organized by the Electric Power Planning & Engineering Institute recently in Kunming, the capital city of Southwest China’s Yunnan Province. Design of the construction drawings has started. Construction of the project is expected to start in November 2007.

The Zhenxiong Power Plant is located at Tangfang Town, Zhenxiong County, Yunnan Province. The plans are to build four 600-megawatt (MW) units in two phases. Two 600 MW supercritical coal-fired units will be built in Phase I. As an important project of Yunnan Province in 2007, the project will be the largest thermal power plant, and the first supercritical coal-fired unit ever built in Yunnan Province, as well as the first supercritical boiler with a “W” shaped flame in the world. The project will be adopted with many new methods and concepts in its design that is targeted on the saving of land, water, material and energy in accordance with the requirements in environmental protection and in soil and water conservations.

The Zhenxiong Power Plant will be built and operated by Yunnan Huadian Zhenxiong Power Generation Company, Limited, a company jointly established by China Huadian Corporation (Beijing, China) (62%), Yunnan Development Investment Company, Limited (Lunming, China) (35%) and Yunnan Dongyuan Coal Mining Group Company, Limited (Yunnan, China) (3%).

As an important power source for the mutual compensation between hydropower and thermal power in the implementing of the strategy of “transmitting power from the west to the east” in China, the project has very important meaning in developing the rich coal resources in northeast Yunnan Province, optimizing the power sources structure and in promoting the local economic development.

According to a related report, the total coal reserve in Zhenxiong County reached 4.7 billion metric tons, and about 3.2 billion metric tons is an exploitable reserve. The coal reserve in the county is not only huge, widely distributed, and easy to exploit, but also of excellent anthracite with high heat productivity, medium or low ash and sulfur content.

Industrial Info Resources (IIR) provides marketing communication services ranging from industrial database solutions to market forecasting, custom analytics, and specialty promotions that support high-level image campaigns.
/news/article.jsp false

Share This Article

Want More IIR News Intelligence?


Make us a Preferred Source on Google to see more of us when you search.

Add Us On Google

Please verify you are not a bot to enable forms.

What is 40 + 3?

Ask Us

Have a question for our staff?

Submit a question and one of our experts will be happy to assist you.

By submitting this form, you give Industrial Info permission to contact you by email in response to your inquiry.

A glowing computer chip is placed on a dark blue circuit board. Bright blue lines and nodes create a futuristic, technological ambiance.

Forecasts & Analytical Solutions

Where global project and asset data meets advanced analytics for smarter market sizing and forecasting.

Explore Our Solutions
Dimly lit data center with rows of towering black server racks, glowing blue lights, and a sleek, futuristic ambiance.

Industrial Project Opportunity Database and Project Leads

Get access to verified capital and maintenance project leads to power your growth.

Discover Our Database