IIR Energy Top Refining News Today: December 16th 2019
Imperial Oil has scheduled a 65-day planned maintenance turnaround on the 540 million-pound-per-year Gas Cracker (Ethylene), 25,000-BBL/d Fluid Coker, 120,000 BBL/d Crude/Vac (AMV) and SRIS 2 (SRU) at its 120,000-BBL/d Sarnia, Ontario, refinery in Canada.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.