American Electric Power Company Incorporated, today, October 20, took 668.85 megawatts (MW) offline from the Donald C Cook 01 unit at its Donald C Cook Nuclear Power Station in Michigan. The unit is ramping back up from a refueling outage and operating at 35%. This event is expected to end later today.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!