Entergy Louisiana LLC took 823.2 megawatts (MW) offline from the Waterford 03 unit, today December 15, at its Waterford Three Nuclear Power Station in Louisiana. The unit is operating at 30% after a reactor trip, and this event is expected to end later today.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.