Pacific Gas & Electric Company, on October 25, took 561 megawatts (MW) offline from the 1,122-MW Diablo Canyon 01 unit at its Diablo Canyon Nuclear Power Station in California, due to storm surge and high water. The unit is operating at 50%. In addition, the restart of the 1,118-MW Diablo Canyon 02 unit has been rescheduled due to high water levels in a feedwater heater, and a leak in a heat exchanger.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!