Abu Dhabi National Oil Company (ADNOC) is on schedule for a 30-day planned turnaround of the Residue Fluid Catalytic Cracker (RFCCU) Block at its 417,000-barrel-per-day (BBL/d) Ruwais Refinery 2 (West) in Abu Dhabi, beginning November 15, 2022. The units are expected to be back online on December 14, 2022.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!