Tehran Oil Refining Company (TORC) continues with a 25-day planned maintenance shutdown of the 53,364-barrel-per-day (BBL/d) Gasoil Hydrodesulfurization Unit at its 250,000-BBL/d Tehran Refinery in Iran. The restart is expected by July 20.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.