BEIJING--May 24, 2013 - Researched by Industrial Info Resources China (Beijing, China)--Following the erection of the generator stator for Unit 1 of China Datang Corporation's (Beijing) 1,200-megawatt (MW) Huaibei Hushan Power Project on February 3, 2013, Anhui Electric Power Construction No.1 Engineering Company (AEPC1) (Hefei, Anhui), a subsidiary of China Energy Engineering Corporation (CEEC) (Beijing), erected the generator rotor for Unit 1 on May 14, according to an announcement from CEEC on May 15.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!