SUGAR LAND--November 11, 2020--Written by John Egan for Industrial Info Resources (Sugar Land, Texas)--Speakers at a natural gas conference on November 9 bemoaned the current difficulties constructing greenfield energy infrastructure, and one speaker said the solution was to optimize existing assets, either by reversing pipeline flows or expanding existing facilities.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!