July 24, 2025--Researched by Industrial Info Resources (Sugar Land, Texas)--Solar power developer Estuary Power (Reno, Nevada) earlier this week announced that it has started commercial operations at its Escape solar farm and battery energy storage system (BESS) in Lincoln County, Nevada. The plant, although now supplying power to a Clark County regional power district and two Nevada entertainment companies, is still under construction, with more than 100 megawatts (MW) of solar capacity and battery storage still to be implemented.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!