WRB is no longer performing maintenance on the 66,000-barrel-per-day (BBL/d) Crude Distilling Unit 4 (DU-4) and 38,000-BBL/d Hydrocracker in early September at its 356,000-BBL/d Wood River Refinery in Roxana, Illinois. At this time, a new schedule for this event is undisclosed.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!