PERTH, AUSTRALIA--September 11, 2013--Researched by Industrial Info Resources (Perth, Australia)--The Cobia Offshore Oil Wellhead Platform was shut down unexpectedly last week after platform staff reported a possible spill. The platform will remain inactive until an investigation is conducted to determine the cause of the "sheen" observed by staff. The multi-billion dollar Kipper Tuna Turrum Project is the product of two joint venture projects. Other companies featured: ExxonMobil Australia Pty Limited (NYSE:XOM), BHP Billiton Petroleum (Bass Strait) Pty Limited (NYSE:BHP)
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!