Tennessee Valley Authority's 1,150-megawatt (MW) Watts Bar 02 Steam Turbine (ST) Unit at its Watts Bar Nuclear Power Station in Tennessee is holding at 95% after ramping up following testing and inspection on a steam generator.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.