Talen Energy Corporation, on December 19, took the 363-megawatt (MW) Brunner Island 01 unit offline due to a boiler tube leak at its Brunner Island Power Station in Pennsylvania. This event is expected to end December 22.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.