Georgia Power Company's 876-megawatt (MW) Hatch 01 Unit at the Edwin I Hatch Nuclear Power Station is coasting down for a refueling outage and currently is at 92%.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.