Valero, on December 29, shut down the 96,000-barrel-per-day (BBL/d) Heavy Oil Cracker at its 220,000-BBL/d Bill Greehey West Complex in Corpus Christi, Texas. The cause and shutdown duration are unknown at this time. The Heavy Oil Cracker will be included in a 45-day turnaround to start mid-January, along with associated units.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!