Reliance Industries Limited (RIL) continues operating its 760,000-barrel-per-day (BBL/d) Jamnagar SEZ Refinery in India at 94%. The 380,000-BBL/d Crude Distillation Unit (CDU) 1 and 380,000-BBL/d CDU 2 are operating at 96% and 91%, respectively. The units are expected to resume full throughput by June 15.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!