PBF Chalmette Refining LLC continues with repairs on its 27,000-barrel-per-day (BBL/d) HDS Diesel Hydrotreater, which was forced to shut down on January 21 due to a fire at its 192,000-BBL/d Chalmette, Louisiana, refinery. At this time, expectations are to return the unit to service by mid-March.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!