<b>BP</b> continues with a 35-day planned maintenance turnaround of the 55,000-barrel-per-day (BBL/d) Hydrocracker and 50,000-BBL/d Reformer 1 at its 250,000-BBL/d Cherry Point Refinery in Washington. The turnaround began April 5.