Cenovus Energy Incorporated, on April 19, began oil-out procedures to perform a 35-day planned maintenance turnaround of the lone crude, 20,000-barrel-per-day (BBL/d) vacuum and 14,000-BBL/d asphalt units at its 30,000-BBL/d Lloydminster Refinery in Alberta, Canada.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!