Ulysseas Incorporated to Inaugurate 44-Megawatt Power Barge in Ecuador
Power Barge II will be equipped with four diesel engines from Maschinenfabrik Augsburg-Nurnberg AG (MAN Diesel) (Germany). The engines will produce 12.5 MW each.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.