Cheniere Energy has started up its second liquefied natural gas (LNG) production train in Corpus Christi. The train will produce 4.5 million metric tons per year of LNG. It is unknown when the LNG will be shipped from this train. Cheniere's phase one for Corpus Christi LNG production includes one more production train, which will bring the site's total production and export capacity to 13.5 million metric tons.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!