EPIC Midstream has begun shipping oil from Crane, Texas, to Corpus Christi. The line was originally built for natural gas liquids but is currently being used to ship oil while a dedicated crude oil pipeline is being built. The pipe can carry 400,000 barrels per day of crude oil.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!