IIR Energy Top Refining News Today: December 23rd 2019
Marathon Petroleum restarted the 60,000-BBL/d RHU Residual (Residual Hydrocracker) on December 19 at its 437,000-BBL/d Galveston Bay Refinery located in Texas City, Texas. The unit was shut down on December 6 for unplanned repairs.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.