Dairyland Power Cooperative, on August 20, took the 387-megawatt (MW) John P Madgett 06 unit offline, due to a boiler tube leak, at its John P Madgett Power Station in Wisconsin. This event is expected to end August 30.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.