Premium Industrial News

IIR Top Chemical Processing News Today

IIR Top Chemical Processing News Today

IIR Top Chemical Processing News Today

Author: Daniel Levin | Published: September 30, 2021
Industry Segment: Chemical Processing  |  Word Count: 292 Words

Formosa Plastics, on September 18, restarted the 1.8 billion-pound-per-year Olefins 2 ethylene unit at its plant in Point Comfort, Texas. The unit went offline on February 15 in preparation for Winter Storm Uri, and remained offline to complete a planned turnaround. At the same plant, the 660 million-pound-per-year Ethylene Oxide (EO)/Ethylene Glycol (EG) Unit remains offline after shutting down on September 27 due to an electrical issue caused by a power failure.

This Premium Article can be purchased individually or as part of a subscription

Subscribe Now!(All Fields Required)

Subscription Type:

  • Pay-Per-Article - $5.95
  • Annual Premium News Subscription - $365.00
Pricing Help?