Marathon, on February 19, shut down the 75,000-barrel-per-day (BBL/d) Crude 2 and 17,000-BBL/d Vacuum Distillation Unit (VDU) on the south side of its 120,000-BBL/d El Paso, Texas, refinery, for planned maintenance. The units should be back online March 1.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.